Title: | a drum-buffer-rope based scheduling method for semiconductor manufacturing system |
Author: | Cao Zhengcai
; Peng Yazhen
; Wang Yongji
|
Source: | IEEE International Conference on Automation Science and Engineering
|
Conference Name: | 2011 7th IEEE International Conference on Automation Science and Engineering, CASE 2011
|
Conference Date: | August 24,
|
Issued Date: | 2011
|
Conference Place: | Trieste, Italy
|
Keyword: | Customer satisfaction
; Rope
; Scheduling
; Semiconductor device manufacture
|
Indexed Type: | EI
|
ISSN: | 2161-8070
|
ISBN: | 9781457717307
|
Department: | (1) College of Information Science and Technology Beijing University of Chemical Technology Beijing 100029 China; (2) State Key Laboratory of Manufacturing Systems Engineering Xi'an Jiaotong University Xi'an 710054 China; (3) State Key Laboratory of Computer Science Institute of Software Chinese Academy of Sciences Beijing 100190 China
|
Sponsorship: | Ansaldo Sistemi Industriali - Results to the Power of Three
|
Abstract: | Scheduling in semiconductor manufacturing system is an important task for the industries faced with a large amount of resource competitions. Effective scheduling can improve the overall system performance and customer satisfaction. In this paper, a scheduling method with the core of bottleneck equipment control is designed referring to Drum-Buffer-Rope (DBR) theory. In order to identify the main-bottleneck, the relative load which takes the feature of reentrance into consideration is applied. For the avoidance of local blocking, the management of sub-bottleneck is presented. As both releasing and dispatching are taken into account, a scheduling method based on the compound priority is formed. Finally, HP-24 semiconductor wafer fabrication is used as an example to demonstrate the effectiveness of the proposed method. © 2011 IEEE. |
English Abstract: | Scheduling in semiconductor manufacturing system is an important task for the industries faced with a large amount of resource competitions. Effective scheduling can improve the overall system performance and customer satisfaction. In this paper, a scheduling method with the core of bottleneck equipment control is designed referring to Drum-Buffer-Rope (DBR) theory. In order to identify the main-bottleneck, the relative load which takes the feature of reentrance into consideration is applied. For the avoidance of local blocking, the management of sub-bottleneck is presented. As both releasing and dispatching are taken into account, a scheduling method based on the compound priority is formed. Finally, HP-24 semiconductor wafer fabrication is used as an example to demonstrate the effectiveness of the proposed method. © 2011 IEEE. |
Language: | 英语
|
Content Type: | 会议论文
|
URI: | http://ir.iscas.ac.cn/handle/311060/16217
|
Appears in Collections: | 软件所图书馆_会议论文
|
There are no files associated with this item.
|
Recommended Citation: |
Cao Zhengcai,Peng Yazhen,Wang Yongji. a drum-buffer-rope based scheduling method for semiconductor manufacturing system[C]. 见:2011 7th IEEE International Conference on Automation Science and Engineering, CASE 2011. Trieste, Italy. August 24,.
|
|
|