中国科学院软件研究所机构知识库
Advanced  
ISCAS OpenIR  > 软件所图书馆  > 会议论文
Title:
a drum-buffer-rope based scheduling method for semiconductor manufacturing system
Author: Cao Zhengcai ; Peng Yazhen ; Wang Yongji
Source: IEEE International Conference on Automation Science and Engineering
Conference Name: 2011 7th IEEE International Conference on Automation Science and Engineering, CASE 2011
Conference Date: August 24,
Issued Date: 2011
Conference Place: Trieste, Italy
Keyword: Customer satisfaction ; Rope ; Scheduling ; Semiconductor device manufacture
Indexed Type: EI
ISSN: 2161-8070
ISBN: 9781457717307
Department: (1) College of Information Science and Technology Beijing University of Chemical Technology Beijing 100029 China; (2) State Key Laboratory of Manufacturing Systems Engineering Xi'an Jiaotong University Xi'an 710054 China; (3) State Key Laboratory of Computer Science Institute of Software Chinese Academy of Sciences Beijing 100190 China
Sponsorship: Ansaldo Sistemi Industriali - Results to the Power of Three
Abstract: Scheduling in semiconductor manufacturing system is an important task for the industries faced with a large amount of resource competitions. Effective scheduling can improve the overall system performance and customer satisfaction. In this paper, a scheduling method with the core of bottleneck equipment control is designed referring to Drum-Buffer-Rope (DBR) theory. In order to identify the main-bottleneck, the relative load which takes the feature of reentrance into consideration is applied. For the avoidance of local blocking, the management of sub-bottleneck is presented. As both releasing and dispatching are taken into account, a scheduling method based on the compound priority is formed. Finally, HP-24 semiconductor wafer fabrication is used as an example to demonstrate the effectiveness of the proposed method. © 2011 IEEE.
English Abstract: Scheduling in semiconductor manufacturing system is an important task for the industries faced with a large amount of resource competitions. Effective scheduling can improve the overall system performance and customer satisfaction. In this paper, a scheduling method with the core of bottleneck equipment control is designed referring to Drum-Buffer-Rope (DBR) theory. In order to identify the main-bottleneck, the relative load which takes the feature of reentrance into consideration is applied. For the avoidance of local blocking, the management of sub-bottleneck is presented. As both releasing and dispatching are taken into account, a scheduling method based on the compound priority is formed. Finally, HP-24 semiconductor wafer fabrication is used as an example to demonstrate the effectiveness of the proposed method. © 2011 IEEE.
Language: 英语
Content Type: 会议论文
URI: http://ir.iscas.ac.cn/handle/311060/16217
Appears in Collections:软件所图书馆_会议论文

Files in This Item:

There are no files associated with this item.


Recommended Citation:
Cao Zhengcai,Peng Yazhen,Wang Yongji. a drum-buffer-rope based scheduling method for semiconductor manufacturing system[C]. 见:2011 7th IEEE International Conference on Automation Science and Engineering, CASE 2011. Trieste, Italy. August 24,.
Service
Recommend this item
Sava as my favorate item
Show this item's statistics
Export Endnote File
Google Scholar
Similar articles in Google Scholar
[Cao Zhengcai]'s Articles
[Peng Yazhen]'s Articles
[Wang Yongji]'s Articles
CSDL cross search
Similar articles in CSDL Cross Search
[Cao Zhengcai]‘s Articles
[Peng Yazhen]‘s Articles
[Wang Yongji]‘s Articles
Related Copyright Policies
Null
Social Bookmarking
Add to CiteULike Add to Connotea Add to Del.icio.us Add to Digg Add to Reddit
所有评论 (0)
暂无评论
 
评注功能仅针对注册用户开放,请您登录
您对该条目有什么异议,请填写以下表单,管理员会尽快联系您。
内 容:
Email:  *
单位:
验证码:   刷新
您在IR的使用过程中有什么好的想法或者建议可以反馈给我们。
标 题:
 *
内 容:
Email:  *
验证码:   刷新

Items in IR are protected by copyright, with all rights reserved, unless otherwise indicated.