Title: | testing in parallel: a need for practical regression testing |
Author: | Zhang Zhenyu
; Tong Zijian
; Gao Xiaopeng
|
Source: | ICSOFT 2010 - Proceedings of the 5th International Conference on Software and Data Technologies
|
Conference Name: | 5th International Conference on Software and Data Technologies, ICSOFT 2010
|
Conference Date: | 37459
|
Issued Date: | 2010
|
Conference Place: | Athens, Greece
|
Keyword: | Data visualization
; Pipelines
; Problem solving
; Regression analysis
; Scheduling
; Testing
; Visualization
|
Publish Place: | Portugal
|
Indexed Type: | ei
|
ISBN: | 9789900000000
|
Department: | (1) State Key Laboratory of Computer Science, Institute of Software, Chinese Academy of Sciences, Beijing, China; (2) R and D, Sohu.com Inc., Beijing, China; (3) School of Computer Science and Technology, Beihang University, Beijing, China
|
Sponsorship: | Inst. Syst. Technol. Inf., Control Commun. (INSTICC); University of Piraeus; University of Piraeus - Research Center
|
English Abstract: | When software evolves, its functionalities are evaluated using regression testing. In a regression testing process, a test suite is augmented, reduced, prioritized, and run on a software build version. Regression testing has been used in industry for decades; while in some modern software activities, we find that regression testing is yet not practical to apply. For example, according to our realistic experiences in Sohu.com Inc., running a reduced test suite, even concurrently, may cost two hours or longer. Nevertheless, in an urgent task or a continuous integration environment, the version builds and regression testing requests may come more often. In such a case, it is not strange that a new round of test suite run needs to start before all the previous ones have terminated. As a solution, running test suites on different build versions in parallel may increase the efficiency of regression testing and facilitate evaluating the fitness of software evolutions. On the other hand, hardware and software resources limit the number of paralleled tasks. In this paper, we raise the problem of testing in parallel, give the general problem settings, and use a pipeline presentation for data visualization. Solving this problem is expected to make practical regression testing. |
Language: | 英语
|
Content Type: | 会议论文
|
URI: | http://ir.iscas.ac.cn/handle/311060/8932
|
Appears in Collections: | 中科院软件所图书馆_2010软件所会议论文
|
There are no files associated with this item.
|
Recommended Citation: |
Zhang Zhenyu,Tong Zijian,Gao Xiaopeng. testing in parallel: a need for practical regression testing[C]. 见:5th International Conference on Software and Data Technologies, ICSOFT 2010. Athens, Greece. 37459.
|
|
|